Solutions

Construction

KEY INFORMATION Street Lighting Columns

STATUS - Active

The framework covers the following lots:
 • Lot 1 - Tubular Steel Columns with Glass Reinforced Epoxy Root Protection
• Lot 2 - Tubular Steel Columns with Thermo-plastic Root Protection
• Lot 3 - Raise and Lower Columns with Glass Reinforced Epoxy Root Protection
• Lot 4 - Raise and Lower Columns with Thermo-plastic Root Protection
• Lot 5 - Sheet Steel Columns with Glass Reinforced Epoxy Root Protection
• Lot 6 - Sheet Steel Columns with Thermo-plastic Root Protection

This framework is led by Durham Council as part of the Hub & Spoke model operated by NEPO.  Read more about Hub & Spoke on our  About Us  page. 

REFERENCE
NEPO218
START DATE
27/10/2015
CURRENT END DATE
26/10/2017
FINAL END DATE SUBJECT TO EXTENSION(S)
26/10/2019
CONTRACT AWARD NOTICE
2015/s 156-286562 11.08.2015
SUPPLIERS
Cu Lighting Ltd
Mallatite Limited
Marwood Electrical Co Ltd
Signature Limited T/A Dee Organ
AVAILABLE FOR USE BY
All Associate Members/Member Authorities

KEY CONTACT

Joanne Peacock
Regional Category Specialist

REQUEST FURTHER INFORMATION

Request further information about this solution, or send us your comments and queries, by completing this form. ENQUIRE >

Other Construction Solutions

Highway Technical Surveys Construction

A framework for the provision of highway network surveys

VIEW >

Highways Surfacing Construction

This solution has been introduced to implement annual planned structural maintenance programmes of work, where carriageways and footways are resurfaced or reconstructed.

VIEW >

Street Lighting Assistance and Independent Connection Provision Construction

This solution is for the provision of street lighting and illuminated street furniture installation works, highway electrical connections on DNO/ IDNO networks and highway electrical connections on privately owned networks.

VIEW >